HSE & Quality
Risk managed before work begins.
Safety and quality are part of how we design, procure and build, with named controls at every stage and the paperwork to show it.
Policy
Our HSE and quality commitments.
Safety and risk control are engineered in, not added on. These commitments guide every project, from the first site visit to long-term operations.
- 1
Plan the work and its safety controls together, before anyone is on site.
- 2
Protect our people, our clients’ people and the public.
- 3
Review designs and inspect work at defined gates, not only at the end.
- 4
Report, investigate and close out every incident and near miss.
- 5
Reduce environmental impact through design, procurement and waste handling.
Management framework
A management framework aligned to ISO 45001, ISO 9001 and ISO 14001.
Our procedures are structured around occupational health and safety (ISO 45001), quality (ISO 9001) and environmental management (ISO 14001). Alignment describes how our system is organised; it is not a certification claim.
ISO 45001
Occupational health and safety
Aligned
ISO 9001
Quality management
Aligned
ISO 14001
Environmental management
Aligned
Controls
What happens on every project.
Delivery controls
- Risk assessments and method statements before work starts
- Permit-to-work for defined high-risk activities
- Lock-out and tag-out for electrical isolation
- Work-at-height and electrical safety controls
- Toolbox talks before each phase of work
- Incident reporting and close-out
Quality controls
- Design review gates
- Inspection and test plans
- Commissioning checklists
- As-built handover
Environmental considerations, from equipment selection to waste handling, are part of design review.
Compliance & insurance
Coverage, registrations and evidence.
Each item is listed with what it covers. Evidence is published on this page as each certificate or licence is issued.
| Item | What it covers | Evidence |
|---|---|---|
| Insurance | ||
| WIBA cover | Work Injury Benefits Act cover for employees | Published once issued |
| Public liability insurance | Third-party injury and property damage | Published once issued |
| Contractors’ All Risks (CAR) | Loss or damage to the works during construction | Published once issued |
| Statutory registrations | ||
| EPRA solar licensing | Licensing to carry out solar PV work | Published once issued |
| NCA contractor registration | Registration as a construction contractor | Published once issued |
| EBK engineering firm registration | Registration of the firm with the Engineers Board of Kenya | Published once issued |
| Management systems | ||
| ISO-aligned systems | Alignment with ISO 45001, ISO 9001 and ISO 14001 | Aligned Policy documents; certificates only if obtained |
See what your site could save in 2 minutes.
Engineered energy, delivered from assessment to operations.